PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing sprinkler branches at the 1st floor Facing North.jpg Layout block at the detention cells Facing West.jpg Low roof storm piping at the 4th floor Facing West.jpg Welding clips at the 1st floor UCIA Lobby Facing South.jpg Block Work at the detention cells Facing West.jpg Core Drilled at Stair -2 2.jpg Installing Stone panel at the 1st floor East Elevation.jpg Installing Stone panels at the East Elevation 1.jpg Installing Stone panels at the East Elevation 2.jpg
Previous pageNext page Block Work at the detention cells Facing West
Block Work at the detention cells Facing West